Commercial
Structured Cabling & Network Installation in Austin
New drops, racks and labeling so every connection is neat, reliable and easy to service.

Cabling
Messy wiring and unlabeled ports turn every small fix into an outage.
We build cabling and racks the right way, so your network is reliable today and easy to change tomorrow. We plan runs, install Cat6 drops to desks, access points, cameras and equipment, and bring everything back to a clean patch panel and rack.
Existing mess? We clean up and re-dress racks, label every port and document what goes where.
Our process
How We Handle Cabling Projects

Step 01
Walkthrough and plan
We map drop locations, pathways and the equipment location, and give you a clear, fixed-bid quote.

Step 02
Clean installation
Cable is routed and supported properly, terminated at plates and patch panels, and racks are built and dressed.

Step 03
Test, label, document
Every run is tested and labeled, and you get documentation you can hand to any vendor or new employee.
One team
Cabling and Network, Handled Together
We can also install and set up the switching, gateways and configuration in the rack, so cabling and network are handled by one team.
Drops and patch panels
Cat6 runs to desks, access points, cameras and printers.
Racks and cleanup
New rack builds or cleanup of existing cable chaos.
Labeling and documentation
Every port labeled and mapped for fast troubleshooting.
Reviews
What Our Clients Say
“Video calls used to freeze or drop constantly. Braxton gave us a solid plan: every desk can hard-wire if needed and Wi-Fi coverage is rock-steady. No more help-desk complaints.”
Janet S., Small office, mid-rise
FAQ
Common Questions
Still have a question? Send it through our quote form and we’ll get back to you, usually within one business day.
Do you clean up existing racks?
Yes. We re-dress messy racks, remove dead cable where possible, label every port and document the result.
Can you set up the network equipment too?
Yes. We install and configure switches, gateways and access points so the whole network is handled by one team.
What happens at the on-site consult?
We walk your space, measure it, run a coverage check and create a mini heat map. You get a recommended gear list and a fixed-bid quote with a couple of options. Home consults take about 45–60 minutes and business consults 60–90 minutes. If you approve the install within 30 days, the consult fee is credited toward it.
How soon can you install?
Lead time is usually 1–2 weeks after the consult, with limited rush slots. Most homes and small offices take one day; multi-access-point or cabling jobs take 1–2 days, and larger projects are scheduled during scoping.
What areas do you serve?
We’re based in Austin and serve Round Rock and the surrounding cities from Waco down to San Antonio, including Georgetown, Cedar Park, Pflugerville, Leander, Hutto, Buda, Kyle, San Marcos and Temple.

Get started
Ready for Cabling You Never Have to Worry About?
Tell us about your space and we’ll plan the drops and rack.
